Skip to main content
Enelex Electrical Services

Residential solar ·

7 Things Homeowners Must Check Before Installing a Home Solar System

A useful solar assessment starts with the property, electricity use and future plans—not a panel count chosen before the site has been considered.

Two workers positioning a solar panel on a metal roof

1 · Roof condition

Start with the roof condition and usable space.

Solar equipment needs to be planned around the roof that is actually there. Existing damage, leaks, fragile areas or roof work already being considered can affect the sequence and scope. Tell the installer about known problems before design work begins so roof repairs and electrical work are not treated as separate surprises later.

Roof material, shape, obstructions and safely usable space also influence what can be installed. A visual assessment from the ground is helpful, but structural suitability and safe access need to be assessed by the appropriate trades.

2 · Sun and shade

Shade and orientation affect the design.

Roof direction, pitch and shade can change when and where the system generates. Trees, chimneys and nearby buildings may cast different shadows through the day and across the seasons. Note what you can see from the ground rather than assuming one roof face is automatically the right answer.

The design should account for the property and when the household uses electricity. Equipment choices should follow that assessment rather than being used as a blanket answer to every shaded roof.

3 · Existing electrical equipment

Review the switchboard and electrical supply.

The existing switchboard, metering and property supply form part of the solar assessment. Age alone does not prove that a switchboard needs replacement, and a photo cannot confirm its internal condition. An electrician needs to assess the actual installation and identify any work required for the proposed design.

If you know of repeated tripping, old fuses, previous electrical alterations or limited space around the board, mention it early. Keep covers closed and share only photos that can be taken safely.

4 · Electricity use

Use recent electricity data to discuss system size.

Roof space does not explain when the home uses electricity. Recent bills and interval data can show seasonal use and the balance between daytime and evening demand. Changes to tariffs or billing periods should be separated from actual energy use when comparing records.

Share normal routines as well as unusual periods. Working from home, heating, cooling, pool equipment and other significant loads can change the pattern that a design needs to consider.

5 · Future plans

Include future battery, EV and electrification plans.

The proposed inverter needs to suit the assessed solar design, while any future battery, EV charger, electric hot-water system or change to heating and cooking can affect household demand and equipment planning. Mention likely changes even if they are not part of the immediate project.

Future compatibility is specific to the proposed equipment, property supply and intended use. It should be checked explicitly rather than assumed from a broad product label.

6 · Equipment position

Plan access and equipment locations.

The inverter and associated equipment need an appropriate position with practical access for operation and later assessment. Available wall space, exposure, clearance, cable routes and how the area is normally used all need consideration.

Point out locked areas, narrow access, pets, shared property or other constraints before the visit. For apartments or common property, identify the relevant property contact and any access process without promising that a particular approval will apply.

7 · Installer and proposal

Compare installers by scope, communication and handover.

Ask who will complete each part of the work and how property-specific questions will be answered. A useful proposal should make the selected equipment, design assumptions, included electrical work and exclusions clear. Ask how monitoring will be set up, what information will be provided at handover and how variations will be handled if the site differs from the initial information.

Compare the proposed scope, not only the headline equipment list. Questions about network connection steps, metering and timing should be answered for the specific property and project rather than through a general promise.

What to prepare for a solar assessment.

  • Recent electricity bills or interval data, if available
  • Any planned changes such as an EV, battery, electric hot water or heating
  • Photos of the switchboard exterior and meter area from a safe position
  • Known roof repairs, leaks or replacement plans
  • Shade you notice at different times of day from ground level
  • Where the inverter could be accessed without blocking normal use

Gather details without taking electrical or roof risks.

Do not climb onto the roof or open the switchboard, inverter or isolators. Take photos only from a stable, safely accessible position and keep clear of damaged equipment or exposed wiring.

If there is smoke, fire, sparking, a burning smell or immediate danger, keep clear and call 000.